Commercial EPC in Hinckley
How the EPC rules and the E minimum apply to Hinckley's logistics parks, older industrial units and town-centre shops, with the borough's latest certificate figures.
Hinckley's commercial property runs from a conservation-area town centre to logistics parks beside the M69, and the borough's certificate figures stand out. Hinckley and Bosworth had 113,600 residents at the 2021 Census, up 8.1% from around 105,100 in 2011.
Why does Hinckley and Bosworth stand out in the EPC figures?
In the Ministry of Housing, Communities and Local Government's energy performance of buildings live tables (table A), Hinckley and Bosworth recorded 232 non-domestic certificates in the four quarters to 30 June 2026, covering about 352,000 square metres: an average of 1,519 square metres each. Of these, 33.2% were rated A+ to B, against 43.6% for England and Wales, and 7.3% were E. Fourteen were rated F or G. That is 6.0%, about 4.6 times the 1.3% national share and the highest of any council with at least 150 lodgements.
What the table cannot show matters as much. It counts certificates lodged for sales, lettings and new buildings, so it does not say whether the 14 are older sheds, offices, shops or units held by one landlord, why they were lodged, or whether any is let. With 232 certificates in the year, each F or G certificate moves the share by about 0.4 of a percentage point. Treat the figure as a prompt to check your own certificate, not as a verdict on the area.
Where are Hinckley's logistics and industrial buildings?
The council's Economic Regeneration Strategy for 2026 to 2030 names logistics and manufacturing as the borough's main employers, puts 18.2% of employee jobs in manufacturing, and counts 4,020 active enterprises, 20 of them large employers with more than 250 staff. The council's list of key sites shows the stock:
- Hinckley Park, a business park next to Junction 1 of the M69, where the council lists a 532,500 square foot building and, at its November 2025 update, a 340,853 square foot unit available.
- Griffen Park in Desford, four miles from Junction 21 of the M1, with a 103,679 square foot unit in phase one and design-and-build opportunities in phase two.
- Diamantem Park Bardon, with outline planning consent for up to 947,650 square feet of industrial and logistics floorspace.
- The Barwell and Earl Shilton sustainable urban extensions, which include 6.2 hectares and at least 4.5 hectares of employment land respectively.
- MIRA Technology Park, the borough's enterprise zone, which the council says houses more than 35 automotive manufacturers and technology companies.
For scale, the 1,000 square metre line in the 2031 proposal is roughly 10,760 square feet, so the Desford unit is nearly ten times that size. A new building on any of these sites needs a certificate when it is finished, and the logistics and big-box guide covers how such sheds are assessed.
What does an F or G certificate mean for the owner of an older unit?
An F or G rating is below the legal minimum for letting, but the minimum bites only where the building needs an EPC and is let on an in-scope tenancy. For an older shed or unit that leaves three routes:
- Improve it to E. The guide to buildings rated F or G lists the usual options.
- Register an exemption before relying on it, such as the seven-year payback test, which lasts five years. GOV.UK warns that an exemption does not carry over on a sale: the new owner must improve the building or register their own. The exemptions guide explains the register.
- Check scope. A fixed term of 6 months or less (unless it can be renewed or extended beyond six months, or the tenant has already been in occupation for more than 12 months) or of 99 years or more falls outside the regulations. An industrial site or workshop that does not use much energy may not need a certificate at all, as the workshops and industrial sites guide explains.
The government's interim response of 18 June 2026 proposes EPC B from 2031 for privately rented buildings over 1,000 square metres where cost effective, with smaller buildings staying at E. That needs secondary legislation, and the interim EPC C milestone for 2027 will not go ahead. The borough's average certificate covers 1,519 square metres, above that line, though an average hides the spread. The guide to the minimum standard sets out the rules and the proposal side by side.
How can I check what a Hinckley building's certificate says?
Start with the government register, which covers business properties as well as homes. GOV.UK says you can search by postcode, street name and town, or certificate number. Check the rating, the lodgement date and which part of the premises the entry covers, because a certificate lasts 10 years and may describe a different unit. The guide to finding a commercial EPC on the register walks through the steps.
How do the town centre's shops and conservation area fit in?
The council designated the Hinckley Town Centre Conservation Area in April 1986; it is centred on Castle Street, Regent Street and the area around the Baptist Chapel. Conservation-area status does not remove the EPC duty, because GOV.UK exempts only a listed or officially protected building where meeting the minimum energy performance requirements would unacceptably alter it.
The council describes Britannia Shopping Centre as the town's prime 7,400 square metre covered centre, with its main entrance off pedestrianised Castle Street. The Crescent opened in late 2015 with a supermarket, a five-screen cinema, restaurants, a new bus station and 550 car parking spaces. A certificate lodged when a scheme opened in late 2015 would have reached its 10-year limit in late 2025, so a unit relying on it needs a newer one before it is sold or let. The multi-let retail guide explains how separate units are treated.
What are the council's climate targets?
Hinckley and Bosworth Borough Council says it is working towards carbon neutrality by 2030 for its direct emissions and a net zero borough by 2050. Those are targets, not duties on landlords: for a let building the legal test is the certificate rating.
Which nearby places have their own pages?
Lutterworth (for the distribution space around Magna Park), Leicester and Coventry each have their own pages, and the East Midlands page covers the wider region. When you are ready, send an enquiry through the quote form with the building's postcode, floor area, the use of each part and whether it is being sold, let or completed.
Commercial EPC questions in Hinckley
Does Hinckley's high F or G share mean a unit there cannot be let?
No. The share describes certificates lodged across the borough, not your building. A unit can be let if its own certificate is E or better, if the tenancy falls outside the regulations, or if a valid exemption is registered. Check the certificate for the specific building.
Does a new unit at Hinckley Park or Griffen Park need an EPC before it has a tenant?
Yes. GOV.UK lists the finishing of a building under construction as a trigger in its own right. If the unit is later divided in a way that adds or extends fixed heating, air conditioning or mechanical ventilation, the change in the number of separately occupied parts can need a new certificate.
Would the proposed EPC B rule cover an 800 square metre factory unit in Hinckley?
No. For example, a privately rented 800 square metre unit would stay on the E minimum, because the June 2026 interim response keeps buildings below 1,000 square metres at E. EPC B from 2031 is a proposal for larger buildings and still needs secondary legislation.
Does an industrial unit that uses little energy need an EPC?
Possibly not. GOV.UK exempts an industrial site, workshop or non-residential agricultural building that does not use much energy, but only if you can demonstrate it. Check the conditions before relying on the exemption.