Commercial EPC in Knowsley
Knowsley is an industrial and logistics borough in its own right, and only two of its certificates in the latest four quarters were rated F or G.
What does Knowsley's commercial EPC profile look like?
Knowsley recorded 178 non-domestic EPC lodgements in the four quarters to 30 September 2026, according to MHCLG's energy performance of buildings live tables (table A, published 29 October 2026). Of those, 38.8% were rated A+ to B and 7.9% were rated E. Two, or 1.1%, were rated F or G.
| Four quarters to 30 September 2026 | Lodgements | Rated A+ to B | Rated E | Rated F or G |
|---|---|---|---|---|
| Knowsley | 178 | 38.8% | 7.9% | 1.1% |
| North West | 11,228 | 38.4% | 7.0% | 1.3% |
| England and Wales | 89,984 | 44.0% | 6.3% | 1.3% |
Source: MHCLG energy performance of buildings live tables, table A. MHCLG expects to publish its next quarterly release on 28 January 2027, so these figures will be updated. Knowsley sits just above the North West and below England and Wales at A+ to B, with two F or G ratings among the certificates lodged. Those 178 certificates cover about 101,000 square metres of floor area, roughly 566 square metres each, against 772 across England and Wales. A low count at F or G does not mean no building in the borough is at risk, because the table counts only certificates lodged in the period, not every building and not older certificates.
The 2021 Census counted around 154,500 residents in Knowsley, up 5.9% on 2011 against 5.2% for the North West.
Where do EPC triggers arise in Knowsley?
Knowsley Business Park
Knowsley Council describes Knowsley Business Park as one of the largest employment sites in Europe, home to over 800 businesses employing 18,000 people. It also says Knowsley is the advanced manufacturing powerhouse of the Liverpool City Region, with growth in warehousing and logistics. The council also notes that the Liverpool2 deep sea port and multi-modal freight terminals are just 20 minutes away. New sheds built to serve that traffic are new buildings, and a newly finished building needs an EPC whether or not an occupier has signed.
Kirkby town centre
Kirkby town centre has a different mix of buildings from the business park. The council says it invested to buy and expand the town centre, with a Morrisons, Home Bargains, drive-through restaurants and a gym delivered, and that a further phase of retail development, under construction at the time of writing, will bring a new Lidl store and additional retail units. Each letting of a retail unit, a drive-through restaurant or a gym needs a valid certificate at the point it is let. Where a building is over 500 square metres, is frequently visited by the public and already has an EPC, GOV.UK says the certificate must also be displayed.
Huyton, Prescot and Halewood
The council's town centres page describes a 10-year development plan for Huyton Village Centre, with new homes, high-quality commercial space, a central village green and public realm improvements. In Prescot it says the council acquired Prescot Shopping Centre and surrounding properties, and the Shakespeare North Playhouse opened in 2022. In Halewood it has plans to extend the local district centre. Each new or refurbished unit in those schemes needs a certificate when it is finished, and each letting needs a valid one.
The Huyton distillery site
In June 2022 the Liverpool City Region Combined Authority announced funding for Network Space's plan to turn the 44,000 square metre former Sovereign Distillery site in Huyton into a multi-let industrial estate for light industrial, logistics and small business occupiers, using part demolition, part refurbishment and part new build. A scheme like this produces certificates at three stages: completion of each new building, any refurbishment that changes the parts used for separate occupation with new or extended fixed heating or ventilation, and each later letting.
Does every unit on a multi-let estate need its own EPC?
Often, yes. The 2012 regulations define a building unit as a section, floor or apartment within a building which is designed or altered to be used separately, and they treat a reference to a building as including a building unit. Two timing rules matter for agents. Before a building is put on the market, the person responsible must secure that an EPC is commissioned, and must use all reasonable efforts to have a valid one within seven days of marketing starting. If one still cannot be obtained in that time despite all reasonable efforts, it must be obtained within the 21 days that follow. A certificate is valid if it was entered on the register no more than 10 years before it is made available and no other certificate for the building has since been entered, so a unit refitted after an earlier lodgement can have the older certificate replaced.
What does the E minimum mean for let sheds and units?
A landlord can only grant, extend or renew a non-domestic tenancy at EPC E or better unless an exemption is registered, and since 1 April 2023 the same has applied to existing lettings. Most fixed lettings of six months or less and leases of 99 years or more are outside the rules. The government's interim response of 18 June 2026 proposes EPC B from 2031 for privately rented buildings over 1,000 square metres, where cost effective, and says the 7-year payback test and exemptions would remain. That test is the exemption route most relevant to a shed: a measure fails it where the expected savings on energy bills over 7 years are less than the cost of repaying it. The EPC B change is a proposal, not law. Sheds are the buildings the threshold would catch first, which is why the industrial and warehouse EPC guide is worth reading before a letting. To ask about a Knowsley unit, send an enquiry through the form; we reply by email.
Do net zero targets change the rules?
Not legally. Knowsley Council declared a climate emergency in 2020 and has a Net Zero Delivery Plan for its own estate and operations, and the Combined Authority has set a target of net zero carbon by 2040. The rating needed to let a building lawfully is set by national regulations.
Which nearby places have their own pages?
For the neighbouring city see commercial EPCs in Liverpool, and Warrington is the other nearby page in the region.
Commercial EPC questions in Knowsley
Does each unit on a multi-let Knowsley estate need its own EPC?
Often, yes. The 2012 regulations define a building unit as a section, floor or apartment designed or altered to be used separately and treat it as a building in most places. A shed split into separately let units therefore needs to be looked at unit by unit.
Must a landlord commission an EPC before marketing a Knowsley unit?
Yes, unless a valid certificate is already available. Regulation 7 says the relevant person must secure that an EPC is commissioned before the building is put on the market, and must use all reasonable efforts to have a valid one within seven days of marketing starting.
Would the proposed EPC B standard catch a Knowsley warehouse?
It would if the building is privately rented and over 1,000 square metres, and EPC B is cost effective. The interim response of 18 June 2026 describes this as a proposal that needs secondary legislation, and says the 7-year payback test and exemptions remain in place.
Knowsley had only two F or G certificates, so is MEES a non-issue there?
Not necessarily. Table A counts certificates lodged in the four quarters to 30 September 2026, not every building or every older certificate. A landlord can check the rating and date on the government register for their own building.