What is a BRUKL report? A guide for building owners

Updated 24 November 2026 · SEO Dons Editorial

What is a BRUKL report for?

It shows building control that a new non-domestic building meets the energy targets in Part L of the Building Regulations, first as designed and then as built. In England a new building must not exceed its target CO2 emission rate (regulation 26 of the Building Regulations 2010) and, since 15 June 2022, its target primary energy rate (regulation 26C). BRE's BREEAM guidance calls the "as designed" BRUKL the version submitted to building control, and also refers to an as-built BRUKL.

The targets are set building by building. The National Calculation Methodology (NCM) website explains that compliance is shown by comparing the proposed building's annual energy use with a notional building of the same size, shape and use, which generates the emission and primary energy targets. The calculation runs in SBEM, the government's Simplified Building Energy Model, or in an approved dynamic simulation model (DSM). When building control asks for those figures before work starts, the page on SBEM calculations explains what is needed and when. BRE also checks BRUKL files when it scores the energy credit in a BREEAM New Construction assessment. For how the report sits beside the on-construction EPC, see EPCs for new commercial buildings.

When does a building need one?

In England, whenever a new building is erected and regulation 26 applies. The design-stage and as-built reports line up with three duties on the person carrying out the work.

StageWhat building control receivesRule
Before work startsBy the day before: the target CO2 emission rate, the rate as designed and the list of specifications. For a higher-risk building this goes with the approval application.Regulation 27(2)
After the air testWhere pressure testing is required, the results within seven days of the final test.Regulation 43
After completionWithin five days: the target, the rate as constructed, and whether the building matches the list or what changed. A certificate from an energy assessor accredited to produce EPCs for that category of building can go with it.Regulation 27(3) and (4)

Work to an existing building follows different rules; the refurbishment and extension guide explains when an extension is treated as a new building. Dates matter for new buildings too. The 2026 England regulations take effect on 24 March 2027 (24 September 2027 for higher-risk work). For other work they do not apply where a building notice, initial notice or full plans went in before 24 March 2027 and work starts before 24 March 2028, and earlier versions of Approved Document L still apply to those buildings.

What do Wales, Scotland and Northern Ireland use?

Each sets its own standard. The NCM website says its SBEM interface can be used for compliance with Part L in England and Wales, Part F in Northern Ireland and Section 6 in Scotland.

NationStandard for new non-domestic buildingsDates
WalesThe 2010 Regulations as they apply in Wales, with requirements approved by the Welsh Ministers and Wales's own Approved Document L, Volume 22022 Volume 2 targets since 29 March 2023; a revised Volume 2 from 4 March 2027
ScotlandStandard 6.1: energy performance calculated by an approved method, and a nearly zero-energy building. Its current metrics include a Target Delivered Energy RateNext energy standards programmed for 2028
Northern IrelandPart F, with Technical Booklet F2 covering regulations 39 to 47 for buildings other than dwellingsSince 30 June 2022

Outside England, ask the council's building control or building standards team which compliance output it wants before the design is fixed.

What does the report tell an owner?

On the reportWhat it measuresWhy it matters
Building emission rate against targetGreenhouse gas emissions, including upstream emissions such as at the power stationMust not exceed the target
Building primary energy rate against targetEnergy before conversion, including upstream lossesIn England, must not exceed the target
List of specificationsThe specifications used to calculate the emission rateRecords the construction and services the figures assume
As-built statusWhether the building matches that list, and any changesShows substitutions made on site
Floor and system areasTotal area and the area each heating, ventilation and air conditioning system serves, actual and notionalBRE expects the system areas to add up to the total

Part L also sets standards that are not a single rate. Requirement L1 asks for limits on heat gains and losses through the fabric and for efficient, well-controlled, commissioned building services, and the NCM website describes a solar gains calculation for criterion 3 of Part L. Ask the energy modeller to show where each is checked.

Know its limits. SBEM uses standardised activity schedules, and the NCM website calls it a compliance and certification procedure, not a design tool or a way to size systems. A pass is not a forecast of energy bills.

How is it different from the EPC for the same building?

Both come from the same kind of model: the NCM website says a similar process produces the EPC's asset rating, and the notice of approval requires non-dwelling EPCs to use SBEM or an approved DSM. They answer different questions.

BRUKL reportEPC
QuestionDoes the building meet its Part L targets?Where does it sit from A+ to G?
BenchmarkA notional building of the same size, shape and useA reference building
Who receives itBuilding controlThe owner, with the certificate entered on the register
WhenBefore work starts, then within five days of completionWithin five days of completion, with notice to building control quoting the register reference
LifespanA record of that building workValid for 10 years
Used for MEESNoYes: a let property is sub-standard if its valid EPC is below band E

So the band that buyers, tenants and the minimum energy efficiency standard look at comes from the EPC, as the guide to how commercial EPC ratings are worked out explains. Because both documents describe one building, the floor area, activities and main systems in the as-built report and the EPC should agree; if they do not, ask the assessor why.

For a large building held to let, note a proposal. The interim response of 18 June 2026 proposes EPC B from 2031 for private rented buildings over 1,000 square metres, where cost effective. It needs secondary legislation, and on 10 November 2026 the consultation page still listed that response as its latest update.

What should you check before accepting one?

  1. It is the as-built version, with the rate for the building as constructed and any changes.
  2. Both rates pass. In England, emissions and primary energy must each be within target.
  3. The changes list is complete. Glazing, insulation, heating, cooling, ventilation or lighting swapped on site should all appear.
  4. The air test result is used. Regulation 43 ties pressure testing to meeting regulation 26, so where the building was tested, ask whether the calculation uses the tested figure.
  5. Defaults were replaced. The NCM website calls the software's defaults conservative and meant to be overwritten, and building control may ask for the documents behind the values entered. Keep them.
  6. The right edition was used, given the project's notice and start dates.
  7. Any certifier is accredited to produce EPCs for that category of building.

Then keep it. Regulation 40 requires the person carrying out the work to give the owner, within five days of completion, enough information about the building, its fixed services and their maintenance for it to run without wasting energy. The as-built report belongs in that handover, beside the on-construction EPC described in the new-buildings guide. If a new or extended building still needs its EPC, you can send an enquiry through the form on this site.

Sources

  • The Building Regulations 2010, regulations 25, 26, 26C, 27, 40 and 43 and Schedule 1, legislation.gov.uk, checked 10 November 2026
  • NCM home page, frequently asked questions and news of 19 December 2022, uk-ncm.org.uk (BRE), checked 10 November 2026
  • BREEAM knowledge base notes KBCN0889, KBCN1620 and KBCN1734, BRE, checked 10 November 2026
  • Future Homes and Buildings Standards 2023 consultation, Building Circular 01/2026, Approved Document L (2026) and the EPC notice of approval of 24 March 2026, GOV.UK, checked 10 November 2026
  • Approved Document L, Welsh Government; non-domestic energy standards modelling report, Scottish Government; Technical Booklet F2, Department of Finance (Northern Ireland), checked 10 November 2026
  • Guide to EPCs for non-dwellings and EPCs for your business premises, GOV.UK; EPB Regulations 2012, regulation 7A; MEES Regulations 2015, regulation 22, checked 10 November 2026
  • MEES interim response of 18 June 2026 and consultation page, DESNZ, GOV.UK, checked 10 November 2026

Common questions

Is a BRUKL report the same thing as an SBEM calculation?

Not quite. SBEM is the government's calculation tool for non-domestic buildings, and an approved dynamic simulation model can be used instead. The BRUKL report is the Part L compliance result of that calculation, prepared for building control.

What happens if the building changes during construction?

Changes are recorded, not forbidden. At completion building control must be told whether the building matches the list of specifications given before work started, and what changed, and the finished building must still meet its targets.

Who should keep the as-built report?

The owner. Regulation 40 requires the person carrying out the work to hand over enough information about the building and its fixed services within five days of completion, and the as-built report is a useful record for a later EPC or refurbishment.

Do Scotland and Northern Ireland use the same report?

They set their own standards: standard 6.1 in Scotland, and Part F with Technical Booklet F2 in Northern Ireland. The NCM website lists both among the checks its SBEM interface can be used for, and the council can confirm the output it wants.